JOHNSTON ATOLL
F&S NO.
81006
TITLE
Missile Transfer Building
USER
STRUCTURE FACILITY NO.
ADC
PROGRAM 437
SCIENTIFIC STATION NO.
119
BOD
None
FOD
FUNDING
AGENCY
SSD
(04-695)
64-10
($000)
ENGR
PROC
CONST
TOTAL
PRE-GO
Prior Cost
3.0
54.8
57.8
TOTAL
3.0
54.8
57.8
FURN
COMPLETED
DESCRIPTION A 40 x 100-ft. steel frame structure is located between Buildings
100 and 120. The building was erected on 5-ft. high concrete piers and is bolstered internally to accommodate three (3) HP hoists witha hook height of 18-ft.
(Completed in 1964.)
DRAWINGS:
VOLI
April 1969
91-119-S1i and 52
91-119-E]
81-6