F&SNO.

TITke

04019: |Saami
.

USER

TC

Ba

sty

Cable -Subtasks A108, A601, A614, A626, A901

909 and A962

gs BLPACILITY NO.

wee.

oe

FURRING

ate

None

SCIENTIFIC STATION NO.

None

.

($000)

ENGR

DASA
PRE-GO
RDT&E
Prior Cost
EAO 11064 FY-69
4101-61
SUBTOTAL

40.8
54. 3
95.1

POST-GO

BoD

PROC

CONST

412.4
104.9
517.3

FoD
TOTAL

FURN

453.2
159.2
612.4

TO BE DETERMINED
PRIOR YEARS

91-079-W113 thru W163

Pah

Drawings:

we

Completed.

PROCUREMENT

oa

;

ENGINEERING

Bulk cable for runs from Building 881 to launchers, togethar

with long lead special cables, has been procured. This includes cable runs for
Subtasks Al08, A601, A614, A626, A901, A905, A9I09 and A962.

FY 69
ENGINEERING Cable design will be accomplished in Las Vegas for Subtask
A962, Launch Pad, Scientific Station 91-3-59 and Launch Pad, Scientific Station
91-3-79, including cable from pad pits to pedestals, cable from Building 881 to
Building 20, and cable within Building 881.

Drawings:

91-079-W188 thru W201
91- 079-W223

$6939 thru W249

PROC URE

Ma

a

1016,

1020 and 1022.

91-079-W251

91-079-W253 thru 260

91-079-W262 thru 276

‘assemblies and cabinets for activiation of Launch Pad,

Scientific Stage
3“$¥ and Launch Pad, Scientific Station 91-3-79 will be procured during FY 69. DASA will furnish cable assembly types 1001 thru 1006,
1019,

CONSTRUCTION During FY 69, preparations will be made for installation of
cable for Launch Pad, Scientific Station 91-3-59 and Launch Pad, Scientific

Station 91-3-79, and from pad pits to pedestals, within Building 881, from
Building 881 to Building 20, and from the AME/AGAVE Field, Subtask A962,
to Buildings 881 and 20 for Exercise LAPWING.
4-10

iit,

VOLI

j="

Select target paragraph3