JOHNSTON ATOLL
F &SNO.
TITLE
04018
USER

COMMUNICATIONS

PMRSignal Cable
STRUCTURE FACILITY NO.

PMR

SCIENTIFIC STATION NO.

None

BoD

None

FOD In Use
FUNDING
AGENCY

($000)

PMR

PRE-GO

0791-99819

Prior Cost

TOTAL

ENGR

PROC

CONST

|

TOTAL

4.0

140.3

144, 3

4.0

140.3

144. 3

FURN

COMPLETED
DESCRIPTION

Signal cable was procured and installed on Akaulsland.

A

Combination Distribution Frame (CDF) was installed in the Operation Building
(Building 1000). Scientific site cable was installed and terminated at this CDF.
The PMR submarine cable was also terminated at this frame. (Completed in
1904)
DRAWINGS:

116-079-W1] thru W6

VOL I

Select target paragraph3