F&SNO.
TITke
04019: |Saami
.
USER
TC
Ba
sty
Cable -Subtasks A108, A601, A614, A626, A901
909 and A962
gs BLPACILITY NO.
wee.
oe
FURRING
ate
None
SCIENTIFIC STATION NO.
None
.
($000)
ENGR
DASA
PRE-GO
RDT&E
Prior Cost
EAO 11064 FY-69
4101-61
SUBTOTAL
40.8
54. 3
95.1
POST-GO
BoD
PROC
CONST
412.4
104.9
517.3
FoD
TOTAL
FURN
453.2
159.2
612.4
TO BE DETERMINED
PRIOR YEARS
91-079-W113 thru W163
Pah
Drawings:
we
Completed.
PROCUREMENT
oa
;
ENGINEERING
Bulk cable for runs from Building 881 to launchers, togethar
with long lead special cables, has been procured. This includes cable runs for
Subtasks Al08, A601, A614, A626, A901, A905, A9I09 and A962.
FY 69
ENGINEERING Cable design will be accomplished in Las Vegas for Subtask
A962, Launch Pad, Scientific Station 91-3-59 and Launch Pad, Scientific Station
91-3-79, including cable from pad pits to pedestals, cable from Building 881 to
Building 20, and cable within Building 881.
Drawings:
91-079-W188 thru W201
91- 079-W223
$6939 thru W249
PROC URE
Ma
a
1016,
1020 and 1022.
91-079-W251
91-079-W253 thru 260
91-079-W262 thru 276
‘assemblies and cabinets for activiation of Launch Pad,
Scientific Stage
3“$¥ and Launch Pad, Scientific Station 91-3-79 will be procured during FY 69. DASA will furnish cable assembly types 1001 thru 1006,
1019,
CONSTRUCTION During FY 69, preparations will be made for installation of
cable for Launch Pad, Scientific Station 91-3-59 and Launch Pad, Scientific
Station 91-3-79, and from pad pits to pedestals, within Building 881, from
Building 881 to Building 20, and from the AME/AGAVE Field, Subtask A962,
to Buildings 881 and 20 for Exercise LAPWING.
4-10
iit,
VOLI
j="