JOHNSTON ATOLL
F &SNO.

02069
USER

JTF

SUPPORT

TITLE

Aircraft Decontamination Facility Number 2

STRUCTURE /FACILITY NO.

SCIENTIFIC STATION NO.

925

Bop

None

GO+30

FODGO+60
FUNDING

AGENCY
AEC

($000)

PRE-GO

Prior Cost

POST -GO

ENGR

PROC

11.4

23.0

CONST

11.4

FURN

34.4

Est. 4/67

TOTAL

TOTAL

23.0

268.0

268. 0*

268.0

302.4

IN ORDER TO MEET THE REQUIRED FULL OCCUPANCY DATE AT GO+60, IT
IS RECOMMENDED THAT ALL PROCUREMENT AND CONSTRUCTION BE
ACCOMPLISHED PRE-~GO.

PRIOR YEARS
ENGINEERING Completed.
Drawings:
PROCUREMENT

91-925-Cl thru C5

91-925-E)] and E5

Procurement of long lead time items has been accomplished.

POST-GO
PROCUREMENT Procure remaining materials of construction.
CONSTRUCTION The Aircraft Decontamination Facility No. 2 will be located on
the west end of the island between the runway center line and the west wharf. The
decontamination facility will be a 125 x 300-ft. reinforced concrete pad 12-inches
thick and will accommodate two RB-57F aircraft simultaneously. A 75-ft. wide

ramp between the decon pad and the existing warm-up apron will enable either
aircraft to be moved on or off the pad independently of the other.

The facility will be provided with three fresh water and three saltwater hydrants

equipped with hoses, nozzles, and hose reels.

These hydrants will be located in

three pits equally spaced along the east edge of the decon pad.

The fresh water-

lines will be used to fill pump trucks for aircraft decontamination and the saltwater lines will be used for wash down of the decon pad. Waterproof power receptacles will be installed around the pad for portable lights. Aircraft tie-down
and static electricity groundings will be imbeded in the concrete pad.

oeeeiniids
2-62

VOLI

April 1969