JOHNSTON ATOLL

SUPPORT

F&S NO.

TITLE

USER

STRUCTURE /FACILITY NO.

SCIENTIFIC STATION NO.

None

None

02036A

Waterfront Facilities - Replace Small Boat Pier

JTF

BoD
FOD

FUNDING

($000)

AGENCY

JTF-8/

MILCON
CRO 4-66

CRO 69-9

ENGR

PROC

CONST

TOTAL

12.0

20.5
188.1

20.5
200.1

12.0

208.6

220.6

PRE-GO

Prior Cost
FY-69

TOTAL

FURN

PRIOR YEARS
ENGINEERING Completed.

Drawings:

JS SK-F-066-S100

JS SK-WM562

PROCUREMENT Completed.
CONSTRUCTION Miscellaneous and minor emergency repairs were performed
on the existing pier to keep it operational.

FY 1969
ENGINEERING In progress.
PROCUREMENT To be accomplished.
CONSTRUCTION The existing small boat pier will be removed and a new pier
will be constructed in the same location. The existing steel piles supporting
the pier structure will be trimmed and cleaned to remove the corroded upper

sections and then will be encased in concrete. New concrete pile caps and
new timber fenders will be installed. Timber decking will be reused as feasible and defective deck members will be replaced. The new pier will be 375ft. in length with six finger piers 50-ft. in length.

be 8-ft. wide.