A,
JOHNSTON ATOLL
02036

h.

SUPPORT
Page 2

Bulkhead No. 1 Improvements Improvements to the bulkhead included
anew 9-in. thick concrete slab, approximately 320 x 570-ft.; mooring
fittings, saltwater fire protection system, freshwater and fuel oil
lines, and two steel ramps about 22-ft. long supported by concrete
piers. Electrical work including floodlighting, manholes, and concrete encased ducts was accomplished.

Le

TG 8.3 Shop The TG 8.3 Boat Group Repair Shop, (Building 126), a

20 x 50-ft, prefabricated, rigid frame steel building was constructed
in the vicinity of the small boat piers.

DRAWINGS:

Naval Facilities Engineering Command Numbers.

1018162 and 1018163
1018482 thru 1018489
1038126

April 1969

VOL I

1038138
1038146 thru 1038150
1038688

2-36

rn

1038739
1038757 thru 1038759
1068953