SET
JOHNSTON ATOLL

SUPPORT

F &S NO.

TITLE

02036

Waterfront Facilities

USER

STRUCTURE/FACILITY NO.

JTF

SCIENTIFIC STATION NO.

See Text

Bop

None
FOD

FUNDING
AGENCY

($000)

DPWO

ENGR

PROC

CONST

TOTAL

FURN

PRE-GO

CONTRACT
NBY 54833

Prior Cost

1,380.5

TOTAL

1,380.5
COMPLETED

DESCRIPTION Improvements to Waterfront Facilities were completed in 1965,
under contract NBY 54833, andincludethe following:
a.

Transformer Building An 18 x 24-ft. masonry building (Building 128)
was constructed adjacent to the shop building (Building 127). This
building houses a 50 kw motor generator set, a 150 kva transformer,

and electrical controls and panels.

New Pier A wooden pier, providing 360-ft. of new frontage was constructed on concrete piles just west of the existing small boat piers.
The pier is equipped with floodlighting, rubber bumpers, diesel and

freshwater lines,

railings, and two walkways to the island.

Dolphins Twenty-one (21) timber pile dolphins were located in the
Johnston Island wharf area.
Fender Systems

Rubber and wood fender systems were installed on

bulkheads 1 and 2 on Johnston Island, bulkhead 3 on Akau Island and

bulkhead 4 on Hikina Island.
CITG 8.6 Quarters

Sheet pile bulkhead was constructed on the north

and west sides of the area occupied by the CJTG 8. 6 Quarters (Building 1) on Johnston Island. The new piling was tied into the original
piling. A wooden pier, 20-ft. long was constructed at the face of the
piling on the west side.

Small Boat Piers Wooden piers about 100-ft. long and 7-ft. wide were
provided on Akau and Hikina Islands. Both piers were equipped with
four 3 pile wood dclphins.
Channel Markers Permanent channel markers were placed in the
Johnston Atoll area channels.