JOHNSTON ATOLL
SUPPORT
F&S NO.
TITLE
USER
STRUCTURE /FACILITY NO.
SCIENTIFIC STATION NO.
None
None
02036A
Waterfront Facilities - Replace Small Boat Pier
JTF
BoD
FOD
FUNDING
($000)
AGENCY
JTF-8/
MILCON
CRO 4-66
CRO 69-9
ENGR
PROC
CONST
TOTAL
12.0
20.5
188.1
20.5
200.1
12.0
208.6
220.6
PRE-GO
Prior Cost
FY-69
TOTAL
FURN
PRIOR YEARS
ENGINEERING Completed.
Drawings:
JS SK-F-066-S100
JS SK-WM562
PROCUREMENT Completed.
CONSTRUCTION Miscellaneous and minor emergency repairs were performed
on the existing pier to keep it operational.
FY 1969
ENGINEERING In progress.
PROCUREMENT To be accomplished.
CONSTRUCTION The existing small boat pier will be removed and a new pier
will be constructed in the same location. The existing steel piles supporting
the pier structure will be trimmed and cleaned to remove the corroded upper
sections and then will be encased in concrete. New concrete pile caps and
new timber fenders will be installed. Timber decking will be reused as feasible and defective deck members will be replaced. The new pier will be 375ft. in length with six finger piers 50-ft. in length.
be 8-ft. wide.
2-37
All of the pier decks will
CORE
VOLI
Apri 909