STATION NOS. 617.03 THRU 615.08

An 8" diameter, extra strong, pipe columnwith a 1/2" x 9" steel plate

leading edge welded thereto, extending approximately 12'-0" vertically

above a "Tee" shaped reinforced concrete base, in which the lower end
is embedded, topped with a 3" diameter extra strong pipe extending

2'-O" above it's top, capped by a cross fitting.

There are three

steel guys to deadmen anchors in the concrete base. The stem section
of the "Tee" base which varies in size, is approximately 4'°-0" wide

x 24*-0" long x 3'-O" deep. The cross bar of the "Tee" base is approximately 3'-0O" wide x 30'-0" long x 3'-0" deep.
(No installed equipment. )

Construction Contract Cost

Engineering Cost

48,921.07

2,148.25

51,069.32

STATION NO. 618
A 15'-0O" high mast of 8" double extra heavy pipe, provided with opening for cable entrance, set in a rectangular reinforced concrete

Construction Contract Cost

Engineering Cost

7,189 .83

278.07

Bach

7467.90

XIGNaAddvV

footing 6'-0" x 18'-0" x 3'-0O" deep; includes a reinforced concrete
battery box 2'-6" square 3'-9" deep, with removeable steel plate top
and 3" diameter steel conduit for cables.
(No installed equipment. )