QUAN. UNIT

vsose

II

YVONNE (Continued)

“TOA

DESCRIPTION OF PROPERTY UNITS

STATION NOS. 619.01 AND 619.02
A double upright frame with cross connection at top, all of 8" diam-

eter double extra strong pipe, with three instrument mounts on the
eross bar and the lower ends of the uprights embedded in a reinforced

concrete base 12'-0" wide x 16'-0" long x 3'-0" deep. A reinforced
concrete battery box 3'-6" x 4'-0" x 3°-9" deep, with a gasketed
ateel plate cover adjoins.

(No installed equipment. )

Construction Contract Cost
Engineering Cost

2

Bach

14,902.28
262 .54

15,164.82

AS LISTED BELOW

STATION NOS, 620.01 THRU 620.04
A 4" diameter pipe standard 8'-O" high with instrument bases and eyebolt, it's lower end incased in concrete and embedded in the reef.
Locations :

reef
reef
reef
reef

at
at
at
at

Gene
Helen
Irene
Noah

ott-b

Construction Contract Cost
Engineering Cost

\
7, 145.64
307.11

Each

7,452.75

XIGNGAddvVv

Station No. 620.01
Station No. 620.02
Station No. 620.03
Station No. 620.04
(No installed equipment. )

Select target paragraph3