QUAN. UNIT TOTAL COST II YVONNE “TIOA DESCRIPTION OF PROPERTY UNITS STATION NO. 617.01 An 8" diameter extra strong pipe column, extending 12'-6" above a "Tee" shaped reinforced concrete base, in which it's lower end is embedded and topped by a 3" extra strong pipe extending vertically 2'-O" above the lower pipe, and capped by a cross fitting. The pipe cOlumn has three heavy steel guys with deadmen anchored in the con- crete base. Stem of the "Tee" shaped base is 6'-0" wide x 22'-3" long with average thickness of 4'-6"; the "Tee" cross bar is 3'-0" wide x 30'-0" long by an average thickness of 4'-6". (No installed equipment. ) Construction Contract Cost Engineering Cost Each 17,167.00 753.66 17,920.66 STATION NO, 617.02 An 8" diameter extra strong pipe column, extending vertically 13'-0" above a "Tee" shaped reinforced concrete base, in which it's lower portion is embedded; topped by a 3" diameter extra strong pipe ex- tending vertically 2'-0" above the larger pipe; with three steel guys to deadmen anchors embedded in the base. Stem of the "Tee" base is 6'-0O" wide x 3'-O" deep x 24'-O" long, the cross bar is 3'-O" x 30'-0" x 3'-0" deep. (No installed equipment. ) Construction Contract Cost Ent-2 Engineering Cost 9,957.18 437.50 10,394.68 XIGNGAddV Each