QUAN. UNIT

TOTAL
COST

II

YVONNE

“TIOA

DESCRIPTION OF PROPERTY UNITS

STATION NO. 617.01
An 8" diameter extra strong pipe column, extending 12'-6" above a

"Tee" shaped reinforced concrete base, in which it's lower end is

embedded and topped by a 3" extra strong pipe extending vertically
2'-O" above the lower pipe, and capped by a cross fitting. The pipe
cOlumn has three heavy steel guys with deadmen anchored in the con-

crete base.

Stem of the "Tee" shaped base is 6'-0" wide x 22'-3"

long with average thickness of 4'-6"; the "Tee" cross bar is 3'-0"
wide x 30'-0" long by an average thickness of 4'-6".
(No installed equipment. )
Construction Contract Cost

Engineering Cost

Each

17,167.00

753.66

17,920.66

STATION NO, 617.02
An 8" diameter extra strong pipe column, extending vertically 13'-0"

above a "Tee" shaped reinforced concrete base, in which it's lower
portion is embedded; topped by a 3" diameter extra strong pipe ex-

tending vertically 2'-0" above the larger pipe; with three steel guys
to deadmen anchors embedded in the base. Stem of the "Tee" base is

6'-0O" wide x 3'-O" deep x 24'-O" long, the cross bar is 3'-O" x 30'-0"

x 3'-0" deep.
(No installed equipment. )

Construction Contract Cost

Ent-2

Engineering Cost

9,957.18

437.50

10,394.68

XIGNGAddV

Each