QUAN.|

UNIT

vsose

II

JANET (Continued )

“TOA

DESCRIPTION OF PROPERTY UNITS

STATION NO. 303 (Continued)
diameter embedded pipe sleeves and 18 gauge galvanized sheet metal
cable ducte.

(No installed equipment. )

Construction Contract Cost
Engineering Cost

1

Each

7,592.78
210.08

7 802,86

OSCAR

STATION NO. 304
Work done for this station includes the installation and the removal
of Users’ cameras and the installation of strip planking.

(No installed equipment. )

Construction Contract Cost

1

Bach

38. 00

38.00

URSULA
STATION NO. 305

Reinforced concrete slab 12'-0" square and 1'-3" thick with a reinSleeves,

(No installed equipment. )

Construction Contract Cost

6tt-L

Engineering Cost

2,988.00

75.00

1

Each

3,063.00

XIGNAddV

forced concrete pedestal 4'-0" x 4-0" x 4'~0" fitted with a 1/2"

thick steel mounting plate and various 3" diameter embedded pipe