QUAN.| UNIT vsose II JANET (Continued ) “TOA DESCRIPTION OF PROPERTY UNITS STATION NO. 303 (Continued) diameter embedded pipe sleeves and 18 gauge galvanized sheet metal cable ducte. (No installed equipment. ) Construction Contract Cost Engineering Cost 1 Each 7,592.78 210.08 7 802,86 OSCAR STATION NO. 304 Work done for this station includes the installation and the removal of Users’ cameras and the installation of strip planking. (No installed equipment. ) Construction Contract Cost 1 Bach 38. 00 38.00 URSULA STATION NO. 305 Reinforced concrete slab 12'-0" square and 1'-3" thick with a reinSleeves, (No installed equipment. ) Construction Contract Cost 6tt-L Engineering Cost 2,988.00 75.00 1 Each 3,063.00 XIGNAddV forced concrete pedestal 4'-0" x 4-0" x 4'~0" fitted with a 1/2" thick steel mounting plate and various 3" diameter embedded pipe