TOTAL
COST

IT

ELMER (Continued )

"TOA

QTt-L

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

STATION NO. 301 (Continued)
Installed equipment:

1 custom made 2-drum hoist, H & N No. HS-57.

(The above list does not contain any user-furnished or user-installed
equipment. )
Construction Contract Coat
Engineering Cost

99,603.87
4 810.63

104,414.50

STATION NO, 302

Reinforced concrete building 9'-4" x 9'=h” x 9'-kh" high O.D. con-

structed on continuous concrete footing 1'-0" below grade; walls 8"
thick, floor and roof 4" thick; area 87 square feet, volume 813 cubic
feet; plywood door; adjacent to reinforced concrete block 25'-0" x

k'..0" x h'.9" fitted with seven steel mounting plates 2'-10" x 2'-10"

x 1/2", various 3" diameter embedded pipe sleeves and 18 gauge galya-

nized sheet metal cable ducts.

(No installed equipment. )

Construction Contract Cost
Engineering Cost

12,904.07
5, 342.08

Bach

18 , 246.15

JANET

Two reinforced concrete blocks, one 17'-0" wide x 4'-0" high x 4'-0"
long, the other 17'-0" wide x 4'-0" high x 3'-0" long, anchored to
the concrete roof of existing Greenhouse Station 69 (Station No.

1001.01) fitted with ten 1/2" thick steel mounting plates, various 3"

XIGNAddV

STATION NO. 303