TOTAL COST IT ELMER (Continued ) "TOA QTt-L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS STATION NO. 301 (Continued) Installed equipment: 1 custom made 2-drum hoist, H & N No. HS-57. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Coat Engineering Cost 99,603.87 4 810.63 104,414.50 STATION NO, 302 Reinforced concrete building 9'-4" x 9'=h” x 9'-kh" high O.D. con- structed on continuous concrete footing 1'-0" below grade; walls 8" thick, floor and roof 4" thick; area 87 square feet, volume 813 cubic feet; plywood door; adjacent to reinforced concrete block 25'-0" x k'..0" x h'.9" fitted with seven steel mounting plates 2'-10" x 2'-10" x 1/2", various 3" diameter embedded pipe sleeves and 18 gauge galya- nized sheet metal cable ducts. (No installed equipment. ) Construction Contract Cost Engineering Cost 12,904.07 5, 342.08 Bach 18 , 246.15 JANET Two reinforced concrete blocks, one 17'-0" wide x 4'-0" high x 4'-0" long, the other 17'-0" wide x 4'-0" high x 3'-0" long, anchored to the concrete roof of existing Greenhouse Station 69 (Station No. 1001.01) fitted with ten 1/2" thick steel mounting plates, various 3" XIGNAddV STATION NO. 303