TOTAL COST II URSULA (Continued ) “TOA O2T-L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS STATION NO. 306 Three reinforced concrete blocks, one 17'-0" long x 4'-0" wide x 3'-0" high, one 16°-8" x 4*-0" x 2'-3" high and one 4'-0" x 4'-0" x k*-0" high anchored to the concrete roof of existing Greenhouse Station 69; fitted with nine 1/2" thick steel mounting plates, various 3" diameter embedded pipe sleeves and 18 gauge galvanized sheet metal cable ducts. Each (No installed equipment. ) Construction Contract Cost Engineering Cost 5,746.02 5,937.38 191. 36 YVONNE STATION NO. 307 Reinforced concrete block, 17'-0" long x 4'-0" wide x 3'-0" high, anchored to the roof of Station No. 1001.03 (existing Greenhouse Sta- tion 69), fitted with three 1/2" thick steel mounting plates, various 3" diameter embedded pipe sleeves, and 18 guage galvanized sheet metal cable ducts. station. A transformer is installed in conjunction with this Installed equipment: Bach 1 - 5 KVA "Gregory" transformer, serial No. 5026219, H & N No. TR-51. (The above list does not contain any user-furnished or user-installed Construction Contract Cost Engineering Cost 3,516.95 181.88 3,698.83 XIQNGUddV equipment. )