TOTAL
COST

II

URSULA (Continued )

“TOA

O2T-L

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

STATION NO. 306

Three reinforced concrete blocks, one 17'-0" long x 4'-0" wide x 3'-0"

high, one 16°-8" x 4*-0" x 2'-3" high and one 4'-0" x 4'-0" x k*-0"

high anchored to the concrete roof of existing Greenhouse Station 69;

fitted with nine 1/2" thick steel mounting plates, various 3" diameter

embedded pipe sleeves and 18 gauge galvanized sheet metal cable ducts.

Each

(No installed equipment. )

Construction Contract Cost

Engineering Cost

5,746.02

5,937.38

191. 36

YVONNE
STATION NO. 307

Reinforced concrete block, 17'-0" long x 4'-0" wide x 3'-0" high,
anchored to the roof of Station No. 1001.03 (existing Greenhouse Sta-

tion 69), fitted with three 1/2" thick steel mounting plates, various

3" diameter embedded pipe sleeves, and 18 guage galvanized sheet metal

cable ducts.
station.

A transformer is installed in conjunction with this

Installed equipment:

Bach

1 - 5 KVA "Gregory" transformer, serial No.

5026219, H & N No. TR-51.

(The above list does not contain any user-furnished or user-installed
Construction Contract Cost
Engineering Cost

3,516.95
181.88

3,698.83

XIQNGUddV

equipment. )

Select target paragraph3