TOTAL
COST

IT

TRENE (Continued )

“TOA

2tt-2

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

STATION NO, 202 (Continued )
continuous anchors in walls and ceiling and exterior copper shielding,

O.D, 16°-0" x 14%-0" x 20'-9" high, connected to Station 200 by a wood

framed, "L" shaped, tunnel with concrete floor, length 87' x 5'-3”"
wide x 9'-0" high: Contains a concrete and timber framed retaining

wall, length 92' x 19'-8”" maximum height, tapering at the ends to
9°-0": complete with electrical wiring and fixtures, ventilation and

lead door; all covered with compacted earth fill to a height of ten

feet above the highest point of the structure, sloping to the top of
the retaining wall.

Bach

(No installed equipment. )

E.C.0. 291 authorizes the installation of a steel plate form and the
pouring of additional concrete in the foundation; and the construction
of a reinforced concrete wall for the center panel of the retaining
wall.
Construction Contract Cost
Engineering Cost

70,390.70
3,583.83

73,974.53

AS LISTED BELOW
STATION NOS. 203.01 THRU 203.09

with bearing plates and anchor bolts, supporting a perforated lead

baffle, 8'-0" x 8'-0" x 1°-0" thick which is mounted on an I-beam
stand.

Each

XICGNaAddV¥

A rectangular reinforced concrete foundation slab 5'-4" x 10'-10" x 8"
thick topped with 8” thick perimeter walls approximately 8'-0O" high