QUAN. UNIT TOTAL COST IT AS LISTED BELOW (Continued ) "TIOA DESCRIPTION OF PROPERTY UNITS STATION NOS. 203.01 THRU 203.09 (Continued ) Locations? Station No. 203.01 Station No. 203.02 Station No. 203.03 Station No. 203.04 thru 203.09 (No installed equipment. ) Flora = Gene Gene Helen = Irene Irene Construction Contract Coat Engineering Cost 16,100.98 286 . 27 16, 387.25 FLORA TO IRENE STATION NO. 204 AND AUXILIARY STRUCTURES A timber, frame flume, 8'-0" x 8'-0" I.D., in nine lineal sections totaling 8,860 lineal feet long; interior sheathed all around with plywood and full reinforced paper lining over 2" x 4" framing. Flume is supported a variable distance above grade by 4" x 4" diagonally braced posts spaced 8'-0" apart, and 4" x 6" diagonally braced posta spaced 12'-0" apart, all on 4'-0" deep concrete footings. Bach (No installed equipment. ) "Chic Salea" Houses: Adjacent to, and spaced along Station No. 20h hk" wood sleeper, with plywood floor and exterior sheathing, aluminum roof; complete with light, power and communication wiring and fixtures. ETt-L (No installed equipment. ) 2h Each XIGNaddvV are 2h wood frame sheds, each 4'-0" x 4°-0" x 7'-9" high, set on 4" x