QUAN.

UNIT

TOTAL
COST

II

TRENE (Continued )

“TOA

DESCRIPTION OF PROPERTY UNITS

SUB-STATION No. 200 (Continued )
(The previous list does not contain any user-furnished or user-in-

atalled equipment. )

Included on B-31

FLORA
STATION NO. 201
A rectangular shaped reinforced concrete, timber and earth fill struc-

ture, 0O.D, 24'-11" x 32'-0" x 2h'-0" high with one 6'-0" thick rein-

forced concrete wall extending 11'-0" above that height and supported
by 12 steel "H" beam piles and a 3'-0" thick pile cap; one 1'-6" thick
concrete wall and two timber walls to 24'-0" height with contained
earth fill; complete with rolled steel shape supports and electrical
services, Located in Station No. 1.

Each

E.C.0. 290 authorizes the installation of two additional 3" conduits

under the foundation and thru the floor, dnd the relocation of three

3" pipe sleeves.

(No installed equipment. )
52,138.83
2,953.36

IRENE
STATION NO. 202

Ttt-L

A rectangular shaped, all reinforced concrete structure with embedded

55,092.19
XIGNaAddvV

Construction Contract Cost
Engineering Coat