QUAN. UNIT TOTAL COST II TRENE (Continued ) “TOA DESCRIPTION OF PROPERTY UNITS SUB-STATION No. 200 (Continued ) (The previous list does not contain any user-furnished or user-in- atalled equipment. ) Included on B-31 FLORA STATION NO. 201 A rectangular shaped reinforced concrete, timber and earth fill struc- ture, 0O.D, 24'-11" x 32'-0" x 2h'-0" high with one 6'-0" thick rein- forced concrete wall extending 11'-0" above that height and supported by 12 steel "H" beam piles and a 3'-0" thick pile cap; one 1'-6" thick concrete wall and two timber walls to 24'-0" height with contained earth fill; complete with rolled steel shape supports and electrical services, Located in Station No. 1. Each E.C.0. 290 authorizes the installation of two additional 3" conduits under the foundation and thru the floor, dnd the relocation of three 3" pipe sleeves. (No installed equipment. ) 52,138.83 2,953.36 IRENE STATION NO. 202 Ttt-L A rectangular shaped, all reinforced concrete structure with embedded 55,092.19 XIGNaAddvV Construction Contract Cost Engineering Coat