QUAN. UNIT TOTAL COST II TRENE (Continued ) "TOA OTT-L DESCRIPTION OF PROPERTY UNITS STATION NO. 200 (Continued) Installed equipment (Station No. 200): 4 - direct drive Suspended, 65,000 B.T.We"H.E. Peterson" dehumidifiers, serial No. E-1232 thru B-1235, H & N Nos. A-176 thru A-179; 1 - 1/2 H.P. 2500 CFM "Master Fan" utility fan, serial No. 0-1584, H & N No. F-208: 1 - 2x 3 "Fairbanks-Morse" centrifugal pump, serial No. 735491, H & N No. DI-136; 1 - 150 g.p.m. “Pacific” bilge pump, serial No. 8851201, H & N No. PU-16; 2 - 40 g.p.m. "Marlow" condenser water pumps, serial Nos. 933094, 82147, H& N Nos. PU-21, PU-22; 2 - 105,000 B.T.U., refrig- erating condensing units, serial Nos. 534403, 531587, H & N No. R-16h) R-165; 1 bush type combination cooling coil with fan, (jobsite prefabrication), H & N No. A-196; 1 - 1/2 H.P. “Westinghouse” motor, H & N No. MO-160. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost 560,156.94 Engineering Cost 26 47h Ua 586 ,631. 34 SUB-STATION NO. 200 Sub-Station No. 200 which adjoins and serves Station No. 200, consista of 3 ~ 75 KVA transformers, 3 primary fuse cutouts, a safety switch, the necessary wiring, conduits, and fittings, which "Unistrut" framing long, and enclosed by 56 lineal feet of timber fence. Installed equipment: 3 - 75 KVA oil immersed "Allis-Chalmers" distribution transformers, serial Nos. 2450537, 2450561, 2452823, H & N Nos. TR-210, TR-211, TR-212, Each XIQGNaAddV supports; erected on a reinforced concrete slab, 4'=0" wide x 9'-0"