QUAN. UNIT

TOTAL
COST

II

TRENE (Continued )

"TOA

OTT-L

DESCRIPTION OF PROPERTY UNITS

STATION NO. 200 (Continued)
Installed equipment

(Station No. 200):

4 - direct drive Suspended,

65,000 B.T.We"H.E. Peterson" dehumidifiers, serial No. E-1232 thru
B-1235, H & N Nos. A-176 thru A-179; 1 - 1/2 H.P. 2500 CFM "Master

Fan" utility fan, serial No. 0-1584, H & N No. F-208: 1 - 2x 3
"Fairbanks-Morse" centrifugal pump, serial No. 735491, H & N No.

DI-136; 1 - 150 g.p.m. “Pacific” bilge pump, serial No. 8851201, H & N

No. PU-16; 2 - 40 g.p.m. "Marlow" condenser water pumps, serial Nos.
933094, 82147, H& N

Nos. PU-21, PU-22; 2 - 105,000 B.T.U., refrig-

erating condensing units, serial Nos. 534403, 531587, H & N No. R-16h)

R-165; 1 bush type combination cooling coil with fan, (jobsite prefabrication), H & N No. A-196; 1 - 1/2 H.P. “Westinghouse” motor,

H & N No. MO-160.

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost 560,156.94
Engineering Cost
26 47h Ua

586 ,631. 34

SUB-STATION NO. 200

Sub-Station No. 200 which adjoins and serves Station No. 200, consista
of 3 ~ 75 KVA transformers, 3 primary fuse cutouts, a safety switch,

the necessary wiring, conduits, and fittings, which "Unistrut" framing

long, and enclosed by 56 lineal feet of timber fence.

Installed equipment: 3 - 75 KVA oil immersed "Allis-Chalmers" distribution transformers, serial Nos. 2450537, 2450561, 2452823, H & N

Nos. TR-210, TR-211, TR-212,

Each

XIQGNaAddV

supports; erected on a reinforced concrete slab, 4'=0" wide x 9'-0"

Select target paragraph3