QUAN.|

UNIT

1

Each

TOTAL
COST

II

FLORA (Continued)

“TOA

HOT-L

DESCRIPTION OF PROPERTY UNITS

STATION NO. 7 (Continued )
of Station No. 1.

(No installed equipment. )
Construction Contract Cost
Engineering Cost

8,718.55
471.59

9,190.14

JANET
STATION NO. 10
Consists of reactivation of Greenhouse Station No. 771, which is a

reinforced concrete structure 8'-0" x 14°-6" x 7°-6" high from 1'=6"
thick foundation footings 4°-6" below grade. Walls, roof and parti-

tions are 1'-0" thick; complete, with electrical wiring and fixtures.
(No installed equipment. )
Construction Contract Cost

Engineering Cost

1

Each

208 .87

61.47

270. 34

EDNA
11

One-story wood conatruction, rectangular shape; size O.D. 10'-10" x
10'-10" x 7°-8"; set on continuous reinforced concrete foundation

with a 6" x 6' x 3'-3" concrete block in center of coral floor, below
grade. Entire structure covered with 15# roof felt placed with hot
mopped asphalt.

Floor area 117 square feet, volume 897 cubic feet.

1

Each

XIGNAddV

STATION NO,

Select target paragraph3