QUAN. UNIT

TOTAL
COST

II

FLORA (Continued )

“TOA

DESCRIPTION OF PROPERTY UNITS

STATION NO. 5 (Continued)
(The previous list does not contain any user-furnished or user-in-

stalled equipment. )

Construction Contract Cost
Engineering Cost

41,063.35

43,819.68

2756.33

STATION NO. 6

A free standing steel tower 375'-0" high; shop welded and field

bolted: horizontally and vertically braced; four legs, each anchored

to a reinforced concrete foundation 17'-0" x 17'-0" x 7'-6" thick;
horizontal section at base measures 33°-9" x 33°-9" tapering to 5'-6"
x 6°-6" at the 325'-0" level and continuing that dimension to the

top; 3/16" checkered floor plate equipment platforms occur at the
325 foot and 375 foot levels; a steel ladder with safety cages is

provided for full height of tower with landings approximately 20'-0"

apart; complete with lightning rod and grounding grid; electric cable
for beacon and obstruction lights and electric power wiring.
(No installed equipment. )

Construction Contract Cost
Engineering Cost

99,260.20
3,826.79

Each

103, 086.99

An ali aluminum tower 9°-0" x 6'-0" x 14'-0" high with 3/16" tread

plate platform decks at 8'-0" and 14'-0" levels; 6" I beam columns
anchored to floor slab of Station 1.

A 12" built-up beam extends from

Eor-L

a pipe column above upper platform and connects to a structural column

XIGNGddV

STATION No. 7