QUAN.| UNIT OTAL vcosr II FLORA (Continued ) "TOA ZOT- 2 DESCRIPTION OF PROPERTY UNITS STATION NO. 4 (Continued) (The previous list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost: 45,707.26 2,911.00 48 618.26 STATION NO. 5 One-story wood frame construction 33°-0" x 24'-9" x 11'-1" mean height erected on a 4" thick reinforced concrete slab: exterior walle of 1/2" plywood; trussed rafters with 1" x 6" diagonal sheathing and cold process composition roofing; interior furred ceiling of 1/4" plywood; cocoon treated: complete with electrical wiring and fixtures; dehumidification equipment and ducts; total floor area 817 square feet; volume 9055 cubic feet. 1 Bach E.C.0. 3713 authorizes the installation of ducts and vente from the E.C.Q. 3719 authorizes the installation of a continuous ceiling on existing joists throughout Station No. 5. Installed equipment: 3 self-contained "Industrial AC" dehumidifi- cation units, serial Nos. 21419, 21476, 21479, H & N Nos. A-175, A-182, A-183. XIQNGYddV electronic equipment; the covering of west side of the station and the roof with sisulation paper; the adjustment of the dehumidification air intakes to compensate for exhausted air from the electronic equipment; the covering of the dehumidification units with a wood frame and canvas structure to protect it from the sun; the removal of the shed and winch to facilitate free air cireulation around the dehumidification units.