FLORA (Continued )

"TOA

ZOT- 2

DESCRIPTION OF PROPERTY UNITS

STATION NO. 4 (Continued)
(The previous list does not contain any user-furnished or user-installed equipment. )
Construction Contract Cost
Engineering Cost:

45,707.26
2,911.00

48 618.26

STATION NO. 5

One-story wood frame construction 33°-0" x 24'-9" x 11'-1" mean height
erected on a 4" thick reinforced concrete slab: exterior walle of 1/2"
plywood; trussed rafters with 1" x 6" diagonal sheathing and cold

process composition roofing; interior furred ceiling of 1/4" plywood;

cocoon treated: complete with electrical wiring and fixtures; dehumidification equipment and ducts; total floor area 817 square feet;
volume 9055 cubic feet.

1

Bach

E.C.0. 3713 authorizes the installation of ducts and vente from the

E.C.Q. 3719 authorizes the installation of a continuous ceiling on
existing joists throughout Station No. 5.

Installed equipment:

3 self-contained "Industrial AC" dehumidifi-

cation units, serial Nos. 21419, 21476, 21479, H & N Nos. A-175,

A-182, A-183.

XIQNGYddV

electronic equipment; the covering of west side of the station and
the roof with sisulation paper; the adjustment of the dehumidification
air intakes to compensate for exhausted air from the electronic equipment; the covering of the dehumidification units with a wood frame and
canvas structure to protect it from the sun; the removal of the shed
and winch to facilitate free air cireulation around the dehumidification units.