QUAN. UNIT TOTAL COST II FLORA (Continued ) “TOA DESCRIPTION OF PROPERTY UNITS SUB-STATION NO. 3 Outdoor sub-station consisting of three 10 KVA transformers installed on a reinforced concrete pad 8'-6" x 3'-6" x 0'-6" thick; primary fuse cutouts and safety switch mounted on a 9'-0" high unistrut tower; station enclosed by 54 Lineal feet of 8'-0" high chain link fence including a 3'-O" hinged gate, and grounded to a grid of #1/0 bare copper wire. Installed equipment: Bach 3 - 10 KVA “Westinghouse” transformers, serial Nos. 5446788, 4886752, 5359918, H & N Nos. TR-100, TR-101, TR-103. (The above list does not contain any user-furnished or user-installed equipment. ) Conetruction Contract Cost 920. 04 920.04 STATION NO. 4 One-story wood frame construction 24'-9" x 16'-8" x 10'-6" mean height with attached generator shed 8'-3" x 16'-8" x 9'-0" mean height with composition roof over diagonal Sheathing; erected on a” thick rein- forced concrete slab 33°'-0" x 16°-8": complete with electrical wiring and fixtures, dehumidification equipment and ducts. feet, volume 5775 cubic feet. Installed equipment: Area 550 square Bach 2 - self-contained, “Industrial AC" dehumidifi- 16" "Master" exhauster roof fans, serial Nos. 5177, 5170, H & N Nos. K-269, K-291; 2 - 4 KVA "Westinghouse" generator motor sets, serial TOT-L Nos. 1S-12B5038, 25-12B5038, H & N No. G-130, G-121. XIQGNaGddV cation units, serial No. 21474, 21425, H & N Nos. A-180, A-181; 2 -