QUAN. UNIT

TOTAL
COST

II

FLORA (Continued )

“TOA

DESCRIPTION OF PROPERTY UNITS

SUB-STATION NO. 3
Outdoor sub-station consisting of three 10 KVA transformers installed

on a reinforced concrete pad 8'-6" x 3'-6" x 0'-6" thick; primary fuse
cutouts and safety switch mounted on a 9'-0" high unistrut tower; station enclosed by 54 Lineal feet of 8'-0" high chain link fence including a 3'-O" hinged gate,

and grounded to a grid of #1/0 bare

copper wire.

Installed equipment:

Bach

3 - 10 KVA “Westinghouse” transformers, serial

Nos. 5446788, 4886752, 5359918, H & N Nos. TR-100, TR-101, TR-103.

(The above list does not contain any user-furnished or user-installed

equipment. )

Conetruction Contract Cost

920. 04

920.04

STATION NO. 4

One-story wood frame construction 24'-9" x 16'-8" x 10'-6" mean height
with attached generator shed 8'-3" x 16'-8" x 9'-0" mean height with
composition roof over diagonal Sheathing; erected on a” thick rein-

forced concrete slab 33°'-0" x 16°-8": complete with electrical wiring

and fixtures, dehumidification equipment and ducts.
feet, volume 5775 cubic feet.

Installed equipment:

Area 550 square

Bach

2 - self-contained, “Industrial AC" dehumidifi-

16" "Master" exhauster roof fans, serial Nos. 5177, 5170, H & N Nos.

K-269, K-291; 2 - 4 KVA "Westinghouse" generator motor sets, serial

TOT-L

Nos. 1S-12B5038, 25-12B5038, H & N No. G-130, G-121.

XIQGNaGddV

cation units, serial No. 21474, 21425, H & N Nos. A-180, A-181; 2 -