QUAN. UNIT TOTAL COST II EDNA (Continued ) "TOA DESCRIPTION OF PROPERTY UNITS STATION NO. 11 (Continued) (No installed equipment. ) Construction Contract Cost Engineering Cost 3,269.19 237,62 3,506.81 YVONNE STATION NO. 12 Consists of reactivation of Greenhouse Station No. 773, which is a reinforced concrete structure 8'-0" x 14'-6" x 7'-6" high from 1'-0" thick foundation footings 4'-6" below grade. Walls, roof and partitions are 1'-0" thick: complete with electrical wiring and fixtures. (No installed equipment. ) Conatruction Contract Cost Engineering Cost Each 208 .87 332,34 123.47 LEROY STATION NO. 13 10'=10" x 7°-8": set on continuous reinforced concrete foundation with a 6' x 6' x 5'-8" concrete block in center of coral floor below grade. Entire structure covered with 15# roof felt placed with hot SOT-L mopped asphalt. Floor area 117 square feet, volume 897 cubic feet. Each XIGNaddvV One-story wood construction, rectangular shape; size 0.D. 10'-10" x