QUAN. UNIT

TOTAL
COST

II

EDNA (Continued )

"TOA

DESCRIPTION OF PROPERTY UNITS

STATION NO. 11 (Continued)
(No installed equipment. )
Construction Contract Cost
Engineering Cost

3,269.19
237,62

3,506.81

YVONNE
STATION NO. 12
Consists of reactivation of Greenhouse Station No. 773, which is a

reinforced concrete structure 8'-0" x 14'-6" x 7'-6" high from 1'-0"
thick foundation footings 4'-6" below grade. Walls, roof and partitions are 1'-0" thick: complete with electrical wiring and fixtures.

(No installed equipment. )

Conatruction Contract Cost

Engineering Cost

Each

208 .87

332,34

123.47

LEROY
STATION NO. 13
10'=10" x 7°-8": set on continuous reinforced concrete foundation

with a 6' x 6' x 5'-8" concrete block in center of coral floor below
grade.

Entire structure covered with 15# roof felt placed with hot

SOT-L

mopped asphalt.

Floor area 117 square feet, volume 897 cubic feet.

Each

XIGNaddvV

One-story wood construction, rectangular shape; size 0.D. 10'-10" x