Site - Elmer:

Approximately 37 lineal feet of 7'-0" high,

wood frame and plywood partitions were added, to make two
additional offices, and an existing wood rail was removed;
Building 176, Personnel Office.
Construction Contract Cost

MWO 141:

Shelter.

mwo 147:

Site - Fred:

168.31

168.31

Site - Elmer: A concrete slab, 54'-0" long x 20'-6" wide
x 4" thick poured under existing Building 360, DUKW Repair
Construction Contract Cost

Bach

1,134.27

Each

1,134.27

Repairs to asphalt runways and parking areas

were made as follows:

(A)

Existing runway from Station No. 00-50 to Station

No. 30-50 was seal-coated.

(B)

Le-13, Parking area was repaired by scarifying the

(C)

The existing runway was patched, broomed and cleaned,

area, the loose material then bladed into windrows,
flattened, sprayed with diluted Bituminal, mixed,
bladed, sprayed evenly and rolled.
surfaced with tack coat of diluted Bituminal, and
then cold mixture of sand and Bituminal spread and

rolled to a compacted thickness of 3/k".

XIGNAddV

MWO 138:

II

TTEM NO. A-35 - MISCELLANEOUS MAINTENANCE WORK ORDERS (Continued )

“TOA