MWO 128:

Site - Fred;

A new fuel. oil purifier and a new 4000 gallon

storage tank were installed in Building No. 56, Power Plant.
Installation included all the necessary pipe, valves, fittings, concrete work, electrical conduits and fixtures.
Construction Contract Cost

MWO 129:

II

TTEM NO, A-35 - MISCELLANEOUS MAINTENANCE WORK ORDERS (Continued )

TOTAL
COST

“TOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

Site - Elmer:

Each

7,116.72

7,116.72

A new 4000 gallon fuel oil storage tank and

a new pump were installed adjacent to the existing storage

tanks near the Power Plant, and a 1-1/2" pipe line was in-

stalled from the new tank to the existing storage tank near
the cargo pler.
Construction Contract Cost
MWO 132:

Site = Elmer:

Each

2,990.86

2,990.86

Two stainless steel sinks mounted in a wood

frame cabinet were installed, and a dry well was constructed,

complete with the required plumbing.

Also, a wood frame and

plywood darkroom was constructed, complete with cabinets,
shelving and electrical service.

Construction Contract Cost

Site - Fred: Electrical wiring and fixtures was installed,
and necessary connections to the overhead distribution line

was made in Building 134, Signal Repair Building.
furnished labor for interlor wiring.

Construction Contract Cost

T6-L

972,80

972.80

Army

559.28

Bach

559.28

XIGNGddV¥

MwO 135:

Bach