MWO 128: Site - Fred; A new fuel. oil purifier and a new 4000 gallon storage tank were installed in Building No. 56, Power Plant. Installation included all the necessary pipe, valves, fittings, concrete work, electrical conduits and fixtures. Construction Contract Cost MWO 129: II TTEM NO, A-35 - MISCELLANEOUS MAINTENANCE WORK ORDERS (Continued ) TOTAL COST “TOA QUAN. UNIT DESCRIPTION OF PROPERTY UNITS Site - Elmer: Each 7,116.72 7,116.72 A new 4000 gallon fuel oil storage tank and a new pump were installed adjacent to the existing storage tanks near the Power Plant, and a 1-1/2" pipe line was in- stalled from the new tank to the existing storage tank near the cargo pler. Construction Contract Cost MWO 132: Site = Elmer: Each 2,990.86 2,990.86 Two stainless steel sinks mounted in a wood frame cabinet were installed, and a dry well was constructed, complete with the required plumbing. Also, a wood frame and plywood darkroom was constructed, complete with cabinets, shelving and electrical service. Construction Contract Cost Site - Fred: Electrical wiring and fixtures was installed, and necessary connections to the overhead distribution line was made in Building 134, Signal Repair Building. furnished labor for interlor wiring. Construction Contract Cost T6-L 972,80 972.80 Army 559.28 Bach 559.28 XIGNGddV¥ MwO 135: Bach