UNIT

TOTAL
COST

MwO 122:

Site Elmer:

(Continued)

electrical wiring, conduits, and fixtures.

Construction Contract Cost
Engineering Cost
MWO 123:

Bach

3,508 .87
147.90

3,656.77

All Sites; A new sea mule was constructed using materials
available at the jobsite, and salvage materiale from the

present barge, (a self-propelled pontoon barge, with A-frame,
H & N No. 101).
Construction Contract Cost
Mwo 12h:

I]

ITEM No. A-35 - MISCELLANEOUS MAINTENANCE WORK ORDERS (Continued )

“TOA

06-2

QUAN.

DESCRIPTION OF PROPERTY UNITS

Site - Fred:

13,758.42

Bach

13,758.42

Repairs were made to the Cargo Pier, Structure

No. 140, by installing sheet steel piling at the share and
bulkheads, and placing fill and cement grout as necessary.

EMWO 125: Site - Fred: Additional Storage Space in Building 403.
Construct and inetall parts bins and construct second floor
decking in Parts Warehouse, Jumbo Quonset No. 403. All in
accordance with details furnished by the Warehouse Supervisor. Install eight lights in proposed hot locker room.
Construction Contract Cost

h ASH. 33

h USK. 33

XIQGNGddvV

Costs Included in Job III <= Maintenance