QUAN. UNIT TOTAL COST MWO 147: Site = Fred: (D) (Continued) The MATS parking area was patched, using cold mix as described in Paragraph (C). Construction Contract Cost MWO 155: (No Site): Bach 27, 472.66 27,472.66 AVR-20987 was rehabilitated by replacing motors and overhauling before installation (Navy furnished); over- hauling emergency generator and engine; replacing all soft patches and deteriorated or damaged timbers and planking in hull: cleaning all sea valves, piping, buttless bearinge, rudder bearings and propellors; placing packing in shaft glands; tuning and adjusting engines, controls, regulators; painting. MwO 161: I TTEM NO, A-35 - MISCELLANEOUS MAINTENANCE WORK ORDERS (Continued) "TOA DESCRIPTION OF PROPERTY UNITS Site - Elmer: Each Building No. 166, Fresh Water Reservoir, was repaired and reinforced by removing water, cleaning, inspecting for leak, holes or tissues; removing and replacing existing expansion joint material; and reinforcing the roof with additional wood beams and columns. Fach t6-4 XIGNAddV Costs Included in Job III - Maintenance