MWO 147:

Site = Fred:

(D)

(Continued)

The MATS parking area was patched, using cold mix as
described in Paragraph (C).

Construction Contract Cost
MWO 155:

(No Site):

Bach

27, 472.66

27,472.66

AVR-20987 was rehabilitated by replacing motors

and overhauling before installation (Navy furnished); over-

hauling emergency generator and engine; replacing all soft
patches and deteriorated or damaged timbers and planking in
hull: cleaning all sea valves, piping, buttless bearinge,
rudder bearings and propellors; placing packing in shaft
glands; tuning and adjusting engines, controls, regulators;
painting.

MwO 161:

I

TTEM NO, A-35 - MISCELLANEOUS MAINTENANCE WORK ORDERS (Continued)

"TOA

DESCRIPTION OF PROPERTY UNITS

Site - Elmer:

Each

Building No. 166, Fresh Water Reservoir, was

repaired and reinforced by removing water, cleaning, inspecting for leak, holes or tissues; removing and replacing

existing expansion joint material; and reinforcing the roof

with additional wood beams and columns.

Fach

t6-4

XIGNAddV

Costs Included in Job III - Maintenance