QUAN. UNIT TOTAL COST II YVONNE (Continued ) “TOA Zeek DESCRIPTION OF PROPERTY UNITS ELECTRICAL FACILITIES Construction of electrical distribution system for camp services in- clude 360 lineal feet of overhead #4 bare copper primary line; 1215 lineal feet of overhead #6 bare copper secondary line; 1340 lineal feet of underground 3/c #6 tirex secondary line; seven 40-foot poles, ten 30-foot poles, 5 transformers and service drops. Conetruction Contract Cost Engineering Cost System 18,123.56 206.52 18, 330.08 FIRE AND FIRST AID BUILDING One-story aluminum structure, 24'-0" x 20'-8-1/2" x 10'-10" mean height, erected on previously existing concrete slab, double roof separated by 2” x 4" redwood purline; contains vented window panels, aluminum partitions; complete with electrical wiring and fixtures and plumbing, counter and shelving; area 597 square feet, volume 6634 cubic feet. Each Installed equipment: 1 sterilizer, H & N No. D-1; 1 - 2h" x 30" x 13" aluminum wall cabinet, H & N No. D-63; 1 - 31" "Simmons" adjustable hospital bed, H & N No. D-153: 1 - 18" x 3421/2" x 24-1/2" aluminum cabinet, H & N No. D-90; 1 - Adjustable mechanical chair, H & N No. ~De156; 1 = "Sturgis" utility chair, H & N No. 0-698. (The above list does not contain any user-furnished or user-installed 2,971.13 53654 3,024.67 7) Construction Contract Cost Engineering Cost XIGNaAddV equipment. )