TOTAL COST YVONNE (Continued) II “TOA QUAN. UNIT DESCRIPTION OF PROPERTY UNITS GENERATOR SHED - AUXILIARY Wood frame structure, 10'-0" x 5'-O" x 8'-O" high, plywood on 3 sides and plywood roof covered with one layer of composition roofing, mounted on existing concrete slab, complete with electrical wiring and fixtures. Installed equipment: Bach 2 auxiliary generators. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 108.19 108 .87 68 LANDING PIER - CARGO AND PERSONNEL - REACTIVATION OF Reactivation of Cargo and Personnel Pier consists of the replacement of approximately 1800 square feet of 3" timber decking. (No installed equipment.) Bach Construction Contract Cost 11,155.49 Engineering Cost 11,423.20 267.71 Rehabilitation of Power and Distillation Plant includes overhaul and repairs or replacements of parts for three diesel engine driven generators with cubicles and panel boards, three distillation units, _ r Eel pumps, diesel engine piping, distillation piping, ventilation equipment and ducts, fans, compressors and incidental equipment. Each XIGNaddv POWER AND DISTILLATION PLANT - REHABILITATION OF