quan] unit

TOTAL
COST

YVONNE (Continued)

II "TOA

DESCRIPTION OF PROPERTY UNITS
ADMINISTRATION BUILDING (Continued }
complete
concrete slab; vented window panels, aluminum partition;

services;
with electrical wiring and fixtures; existing fvesh water

area O.D. 1072 square feet; volume 12864 cubic feet.
Installed equipment:

1 - 10 gallon

50D017790, H & N No. CA-16}.

1

Each

"Larco" water cooler, serial No.

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost

Engineering Cost

3,050.97

3,165.70

114.73

CARPENTER SHOP

Wood frame structure, 28°-0" «x 20'-O" supporting canvas tarpaulin toy,
559 square feet; complete
ecnstructeda on existing concrete slab, area

with electrical wiring and fixtur--.

1

Eagqh

71869,
Installed equipment: 1 - 16" "Dewalt" table saw, serial No.
4926,
No.
H & N No. C-13; 1 - 30" "Jones Superior” band saw, serial
a & N No. C-10.

user-installed
{The above list does not contain any user-furnished or

Terk

Construction Contract Cost
Engineering Cost

1,211.78
7-64

1,219.42

XIGNGddV

equipment. )

Select target paragraph3