UNIT II YVONNE (Continued) TOTAL COST “TIOA O¢el QUAN. DESCRIPTION OF PROPERTY UNITS BUILDING NO, 122 - GARBAGE STORAGE SHED (Continued) screen siding and corrugated aluminum roofing, erected on an existing concrete slab; I.D. 7'-4k" x 7'h" x 7'-9" high, area 156 square feet, volume 4h cubic feet; complete with plumbing, salt water piping and steam piping. (No installed equipment,) Bach BUILDING: NO. 125 - REEFER A omeestory, wood frame, trussed building 34'-0" long x 33'-0" wide x 11'-6" mean height, with plywood siding and wood louvers on three sides, comnected to Mess Hall, Building 102, on the fourth side, erécied op a 3b°-0" y 22'-O" x 5" thick concrete slab with continuous footing 1'-6" deep. Building contains three 12'-10" x 9'-O" walk-in reefers, each with a compressor unit mounted on the exterior of the building, one 8'-0" x 5'-10" walk-in reefer, 5 - 12'-0" long x 7'- 10-1/2" high shelf racks, and all necessary electrical conduits, wiring, and fixtures. Area 11¢¢ square feet, volume 12,903 cubic feet. Bach Installed equipment. 3 - 12'-10" x 9'-O" walk-in reefers, 1 - 8'-0" x 5‘'-10" walkein reefer. (The above list does not contain any user-furnished or user-installed equipment. } 95,006.19 588 .96 ADMINISTRATION BUILDING A reconstructed oneestory prefabricated aluminum building; size I.D. 2h'-0" x 4y'-8-1/2" x 12'-0" high, erected on a previously existing 95,999.15 XIGNGddV Construction Contract Cost Engineering Cost