QUAN.}

UNIT

TOTAL
COST

II

GENE (Continued)

“TOA

QT-L

DESCRIPTION OF PROPERTY UNITS

OFFICE - AEC SECURITY (Continued)
(No installed equipment. )
Construction Contract Cost
Engineering Cost

21h .33

5 00

219.33

OFFICE - AIR DISPATCH

Wood frame structure with wood floor, supporting a 16'-0" x 16'-0"

canvas tent; area 256 square feet, complete with electrical wiring
and fixtures.

(No installed equipment. )

Construction Contract Cost.
Engineering Cost

1

Each

457.24
10.68

467.92

OFFICE - CONTRACTORS AND SURVEYORS

One-story wood frame construction; gable roof;

rectangular shape,

O.D. 14'-O" x 17'-5" x 9'-1" mean height set on 6" x 6" wood skids.

Plywood and screen siding, composition roofing.

trical wiring and fixtures.
cubic feet.

Complete with elec-

Floor area 244 square feet, volume 2217

2

Each

These are rehabilitated structures removed from David.

Construction Contract Cost

Engineering Cost

253.98
9 93

259.91

XIGNAddvV

(No installed equipment. )