QUAN.)

UNIT

soar

II

GENE (Continued)

"TOA

DESCRIPTION OF PROPERTY UNITS

OFFICE - INSPECTOR'S

Wood frame structure, 10'-0" x 12'-0" x 8'-0O" mean height, plywood
sides and floor, plywood roof with one layer composition roofing,

mounted on wood skids; area 120 square feet, volume 960 cubic feet,
complete with electrical wiring and fixtures.

(No installed equipment. )

Construction Contract Cost
Engineering Cost

1

Bach

171.46
4 Ol

175.47

OFFICE - H & N GUARD

Wood frame structure, 12'-0" x 12'-0" x 8'-O" mean height, plywood
sides and floors, plywood roof with one layer composition roofing,
set on wood skids; area 144 square feet, volume 1152 cubic feet,
complete with electrical wiring and fixtures.

(No installed equipment. )

Construction Contract Cost
Engineering Cost

1

Bach

205.76
4,80

210.56

OFFICE - MARINE DISPATCHER'S

sides and floor, plywood roof with one layer composition roofing,
set on wood skids; area 256 square feet, volume 2560 cubic feet,
complete with electrical wiring and fixtures.

(No installed equipment.)

61-L

Construction Contract Cost
Engineering Cost

‘457.24
10.68

1

Bach

h67 .92

XIQGNGddV

Wood frame structure, 16'-0" x 16'-0" x 10'-0" mean height, plywood

Select target paragraph3