TOTAL
COST

II

GENE (Continued)

“TOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

MARINE FACILITIES
Marine Facilities on Gene consist of a coral fill jetty with a sta-

bilized coral surface, which is approximately 7' above low tide, 944!
long x 50' wide.

210' at the end of the jetty is 100' wide and con-

tains a personnel pier, a cargo pier, amd a concrete ramp.

The

personnel pier is of wood and 12" diameter wood pile construction,

and is 72'-2" long x 10' wide and contains a stairway leading to a

landing ramp 34'-6" long x 3'-9" wide. The cargo pier is of similar
construction and is approximately 30' long x 24' wide, and contains

a wing on each side perpendicular to the long axis; each wing is 30'

long x 3* wide and contains a 3' high wood handrail along one side.

The ramp is of reinforced concrete construction, 110' long x 85' wide
x 8" thick, and slopes towards sea level at a 10% grade. Marine
facilities include a 250' wide turning basin and a 150' wide channel

to the lagoon, both of which are dredged to minus 7’.

Each

B.C.0. 294 authorizes the fabrication and installation of three dead-

man anchors, required to assist in the landing of heavy loads.

(Note:

F.S.-778, Station No. 671 - a deadman anchor - was used as a reference
drawing.)

(No installed equipment. )

Construction Contract Cost

Engineering Cost

175,339.50

2,600.79

177,940 .29

Wood frame structure, 12'-0" x 10'-O" x 10'-O" mean height, with

Lt-h

plywood sides and floor, and plywood roof with one layer of composition roofing, set on wood skids; area 120 square feet, volume 1200
cubic feet, complete with electrical wiring and fixtures

Bach

XIGNaAddvV

OFFICE - AEC SECURITY