TOTAL
COST

II

GENE (Continued)

“TOA

gT-2

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

INFIRMARY
One-story wood frame construction, rectangular shape, 0.D. 12'-O" x

27'-10" x 8'-10" mean height set on wood sills.

Gable roof on one

end and hip roof on the other end, with corrugated aluminum roofing,

wood and screen siding.

and plumbing.

cubic feet.

Complete with electrical wiring and fixtureg

Floor area 0.D. 334 square feet.

Volume 0.D. 2950

This is a rehabilitated structure moved from David.

Each

Installed equipment: 1 - 16" x 16" x 14" "Castle" sterilizer, seriall
No. C-416, H & N No. D-50; 1 "Bowser" biological refrigerator, seriall
No. 10221, H & N No. D-5; 1 "Stephenson" portable resuscitator,
serial No. 845; H & N No. D-105; 1 - "Aloe" instrument cabinet, (no
serial No.), H & N No. D-110; 1 "Spencer" laboratory lamp, (no seriall
No.), H& N No. D-120,
(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost

Engineering Cost

1,329.79

51.44

1, 381.23

LIVING QUARTERS - GUARDS

Wood frame structure, 32'-O" x 16'-O", with wood floor, supporting a
(No installed equipment. )

Construction Contract Cost

Engineering Cost

1,791.49

26.51

Each

1,818.00

XIGNAddvV

canvas tent; area 512 square feet; complete with electrical wiring
and fixtures.

Select target paragraph3