GENE (Continued)

IT "TOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

FIRE STATION (Continued)

contains wood storage shelves 6' -6-5/8" high, 6'-3" wide, and 260"
deep. A concrete gear washing pad, 4'-3" x 4'-6" is installed adjacent to the building.

(No installed equipment. )
Construction Contract Cost
Engineering Cost

Bach

1,532.85
59.29

1,592.14

FUEL DUMP

Compacted and stabilized area, covered with 4" x 4" wood sleepers,
allocated for the storage of lubricating and fuel oil.

imately 224 square feet.
(No installed equipment.)

Construction Contract Cost
Engineering Cost

Area approx-

Fach

534.20
6.15

540.35

GYMNASIUM

Wood frame structure, 16'-0" x 32'-0" x 10'-O" mean height, plywood

sides and floor plywood roof with one layer composition roofing; area
Each

(No installed equipment. )

Construction Contract Cost

St-2

Engineering Cost

1,791.49

26.51

1,818.00

XIGNaAddV

512 square feet, volume 5120 cubic feet, complete with electrical
wiring and fixtures.