TOTAL COST GENE (Continued) IT "TOA QUAN. UNIT DESCRIPTION OF PROPERTY UNITS FIRE STATION (Continued) contains wood storage shelves 6' -6-5/8" high, 6'-3" wide, and 260" deep. A concrete gear washing pad, 4'-3" x 4'-6" is installed adjacent to the building. (No installed equipment. ) Construction Contract Cost Engineering Cost Bach 1,532.85 59.29 1,592.14 FUEL DUMP Compacted and stabilized area, covered with 4" x 4" wood sleepers, allocated for the storage of lubricating and fuel oil. imately 224 square feet. (No installed equipment.) Construction Contract Cost Engineering Cost Area approx- Fach 534.20 6.15 540.35 GYMNASIUM Wood frame structure, 16'-0" x 32'-0" x 10'-O" mean height, plywood sides and floor plywood roof with one layer composition roofing; area Each (No installed equipment. ) Construction Contract Cost St-2 Engineering Cost 1,791.49 26.51 1,818.00 XIGNaAddV 512 square feet, volume 5120 cubic feet, complete with electrical wiring and fixtures.