TOTAL COST II GENE (Continued) “TOA qT-L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS ELECTRICAL FACILITIES (Continued) Installed equipment: 6 - 5 KVA pole transformers; 10 - 10 KVA pole transformers; 2 - 15 KVA pole transformers; 2 - 37-1/2 pad trans- formers; 1 - 50 KVA pad transformer; 1] - 10 KVA pier transformer. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 58,663.44 476.98 59,140.42 ELECTRICAL SHOP Wood frame structure, 26'-O" x 12'-0" x 10'-0" mean height, plywood sides and floor, plywood roof with one layer composition roofing, mounted on concrete piers; area 312 square feet, volume 3120 cubic feet, complete with electrical wiring and fixtures. (No installed equipment. ) Construction Contract Cost Engineering Cost TH .O7 8.57 Each 752.64 FIRE STATION aluminum roofing, plywood siding on one end and two sides only. Complete with electric wiring and fixtures and fresh water service. Floor area 0.D. 448 square feet, volume 4256 cubic feet. Building XIGNaGdddV A one-story wood structure, rectangular shape, 0.D. 14°-0" x 32'-0" x 9'-6" mean height, set on 4" x 4" md sill with 4" x 4" posts buried 2' in ground. Floor of 6" thick stabilized coral. Corrugated