ELECTRICAL FACILITIES (Continued)

Installed equipment:

6 - 5 KVA pole transformers; 10 - 10 KVA pole

transformers; 2 - 15 KVA pole transformers; 2 - 37-1/2 pad trans-

formers; 1 - 50 KVA pad transformer; 1] - 10 KVA pier transformer.
(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost
Engineering Cost

58,663.44
476.98

59,140.42

ELECTRICAL SHOP

Wood frame structure, 26'-O" x 12'-0" x 10'-0" mean height, plywood
sides and floor, plywood roof with one layer composition roofing,

mounted on concrete piers; area 312 square feet, volume 3120 cubic
feet, complete with electrical wiring and fixtures.

(No installed equipment. )

Construction Contract Cost

Engineering Cost

TH .O7

8.57

Each

752.64

FIRE STATION

aluminum roofing, plywood siding on one end and two sides only.

Complete with electric wiring and fixtures and fresh water service.

Floor area 0.D. 448 square feet, volume 4256 cubic feet.

Building

XIGNaGdddV

A one-story wood structure, rectangular shape, 0.D. 14°-0" x 32'-0"

x 9'-6" mean height, set on 4" x 4" md sill with 4" x 4" posts
buried 2' in ground. Floor of 6" thick stabilized coral. Corrugated