QUAN. UNIT TOTAL COST II GENE (Continued) “TOA DESCRIPTION OF PROPERTY UNITS CHAPEL (Continued) canvas tent; area 512 square feet, complete with electrical wiring and fixtures, and wood benches, altar. (No installed equipment. ) Construction Contract Cost Engineering Cost Each 1,791.49 26.52 1,818.01 BLECTRICAL FACILITIES The overhead distribution system consists of eleven 25' foot poles, five 30'foot, eleven 40'foot, four 45'foot and one 50'foot pole; primary lines include approximately 5000 lineal feet of #6 bare copper wire. Secondary system includes approximately 3500 lineal feet of #8 weather proof wire. The lighting system for the pier consists of twelve 50' foot poles; primary distribution includes 2000 lineal feet of #6 bare copper wire; secondary system includes 2400 lineal feet of #8 weatherproof and 7000 lineal feet of #6 weatherproof wire. Navigation lights are installed on a pole at the end of the pier and on a 50 foot pole on the causeway between Gene and Helen; this system includes 600 lineal feet of 3/c #8 direct burial cable. tion of eleven 50 foot poles with five flood light fixtures attached to the five poles at the cargo and personnel piers, and lighting €t-L fixtures at the other six poles along the causeway. Sya tem XIGNGddvV E.C.0, 287, causeway and pier lighting, consists of the new construc-