ee

eng"

(3)

(3) B-36 aircra’t for control, effects and samp-

.. lingg missions for U-Da:Je

Operet
igns

am ow)

(See Annexes &

K,

TG 7.

ne"830D
FDMarteod on

der. 3554) Ome Ke-6Contvoe

Provide one (1) B-47 aircraft for an effects ‘missions on

U-Day.

(See Annex J, TG Tos Operations Order 2n5h). ny

Integrate the operations of’ three (3) B-50 aircraft into U-Days

(See Annex 0, TC-7.4 Operations Order 25h) wy

(6)

;

Assure adequate sample renoval.,procedures for U-Day. (See

Annex R Task Group “Teh Operations Order 2-54) 6

en)

(8)

:

Ago

|

.

Augment the ‘field neintenance facilities of the Test Support.
.
:
fog
Unit as required.
ve

7

4

-

‘Provide for complete care, storage and issue of personal

wow

=

D

equipment to all aircrews of the Test Aircraft Unit.” gone a

i To | (9) Prepare the marshaling plan for’ all aircraft ‘which will depart.
-

i

- from ENIWETOK to participate: in U-Day, and special missions».

Prepare a post-mission parking plan for all aircraft that willms
dand at ENIWETOK after the completion of their mission. or

. ay

Prepare a mission execution chart and assure “that take-offs

‘

E

: "c2) ‘Provide for aircraft decontamination, 4
v

-

De

~

Test Service

.

.

ite

~

non

s

rl.

ne

eo
‘

ow Provide three (3) on5h photographie ‘aircraft and‘crews for
V-Day.

Bee Annex L, TG Tol Operations Order. 2n5h) 0.
er

:

Toate

. Brecute’ assiignedmissions, ‘indiuding that specified in Annex AS

Provide adequate SA-16 and other: required SAR eupport. to the ~

A0C and CIC for operational control throughout the U-Day event.

we

(See Annex F, 1G.7.4 Operations Order 2-54)< Additional SA-16 - 7

aircraft for’ back up purposes may be obtained“from Test Bupport., mo

Unit. as

ee

“Provide adequateW
‘wB-29 Weather Roconnalasenes, cloud tracking “
and sampling services throughout the D-Day | event. _ ee. Annex -:

M, TG Toh Cperations Order 2254)°

;

“lo

‘Assure adequate prémissiot, weather’forecastingag‘require
for the U-Day events.rr rr
we
“ode
Do:
a

,

ae

: Provide: necegsary weather ‘pristings and weather:“reports ‘to as
-the SIC “and A0C throughout heBaPay events.’
:
.
-

Ore

: Assure“gdequate. communications fectlities throtighout¢theos
U-Day events wee

»

rege TN

“ee

aa

—

Augment the “field maintenance ‘esata of the Test& Support,
- Unit as required.”, ae RS
oe.

CE ky i

rg.

ae

and landings are ‘accomplished as ‘specified in. Annex c, ae

.

oy ‘Coordinate with “Test Mreraft, Unit +0 |assure that Test‘Services
> eat atroraft, are:marshaled, as required ‘by.that unit

io),provide ‘for.‘complete care,

storage and Séeuc ‘of “personal

: equipment _ to alt aircrews
fe OFthe Test:Services Unit,

on ;

L

Select target paragraph3