ee
eng"
(3)
(3) B-36 aircra’t for control, effects and samp-
.. lingg missions for U-Da:Je
Operet
igns
am ow)
(See Annexes &
K,
TG 7.
ne"830D
FDMarteod on
der. 3554) Ome Ke-6Contvoe
Provide one (1) B-47 aircraft for an effects ‘missions on
U-Day.
(See Annex J, TG Tos Operations Order 2n5h). ny
Integrate the operations of’ three (3) B-50 aircraft into U-Days
(See Annex 0, TC-7.4 Operations Order 25h) wy
(6)
;
Assure adequate sample renoval.,procedures for U-Day. (See
Annex R Task Group “Teh Operations Order 2-54) 6
en)
(8)
:
Ago
|
.
Augment the ‘field neintenance facilities of the Test Support.
.
:
fog
Unit as required.
ve
7
4
-
‘Provide for complete care, storage and issue of personal
wow
=
D
equipment to all aircrews of the Test Aircraft Unit.” gone a
i To | (9) Prepare the marshaling plan for’ all aircraft ‘which will depart.
-
i
- from ENIWETOK to participate: in U-Day, and special missions».
Prepare a post-mission parking plan for all aircraft that willms
dand at ENIWETOK after the completion of their mission. or
. ay
Prepare a mission execution chart and assure “that take-offs
‘
E
: "c2) ‘Provide for aircraft decontamination, 4
v
-
De
~
Test Service
.
.
ite
~
non
s
rl.
ne
eo
‘
ow Provide three (3) on5h photographie ‘aircraft and‘crews for
V-Day.
Bee Annex L, TG Tol Operations Order. 2n5h) 0.
er
:
Toate
. Brecute’ assiignedmissions, ‘indiuding that specified in Annex AS
Provide adequate SA-16 and other: required SAR eupport. to the ~
A0C and CIC for operational control throughout the U-Day event.
we
(See Annex F, 1G.7.4 Operations Order 2-54)< Additional SA-16 - 7
aircraft for’ back up purposes may be obtained“from Test Bupport., mo
Unit. as
ee
“Provide adequateW
‘wB-29 Weather Roconnalasenes, cloud tracking “
and sampling services throughout the D-Day | event. _ ee. Annex -:
M, TG Toh Cperations Order 2254)°
;
“lo
‘Assure adequate prémissiot, weather’forecastingag‘require
for the U-Day events.rr rr
we
“ode
Do:
a
,
ae
: Provide: necegsary weather ‘pristings and weather:“reports ‘to as
-the SIC “and A0C throughout heBaPay events.’
:
.
-
Ore
: Assure“gdequate. communications fectlities throtighout¢theos
U-Day events wee
»
rege TN
“ee
aa
—
Augment the “field maintenance ‘esata of the Test& Support,
- Unit as required.”, ae RS
oe.
CE ky i
rg.
ae
and landings are ‘accomplished as ‘specified in. Annex c, ae
.
oy ‘Coordinate with “Test Mreraft, Unit +0 |assure that Test‘Services
> eat atroraft, are:marshaled, as required ‘by.that unit
io),provide ‘for.‘complete care,
storage and Séeuc ‘of “personal
: equipment _ to alt aircrews
fe OFthe Test:Services Unit,
on ;
L