(3) Provide three (3) B-36 aircraft for control, effects and
sampling missions for N-Day,

TG 7,4 Operations Order 55/,) «

(4)
(5)

(See. Annexes G, I and K,

Provide one (1) B-47 aircraft for an effects mission on
NeDay. (See -nnex J, TG 7,4 Operations Order 5~54).
Integrate the operations of three (3) B-50 aircraft into

"Day.

(See Annex 0, TG 7.4 Operations Order 5~5/,).

(6)

Assure adequate sample removal procedures for i-Day,

(7)

Augnent the field maintenance facilities of the Test Support
Unit as required.

Annex R, TG 7.4 Operations Order 5-54).

(See

Provide for complete care, storage and issue of personal
ecuipment to all air crews of the Test Aircraft Unit

Prepare the marshaling plan for all aircraft vheih vill

depart fron EV TVETOK to participate in W-Day, and specicl
missions,

‘be.

(10)

Prepare a post mission parking plan! for all aircraft that

(12)

Prepare a mission execution chart and assure that take-offs

(12)

Provide for aircraft decontemination,

will land at ENIWETOK after the completion of their mission.
and landings are accomplished as specified in Annex CG,

Test Services Unit:

(1)

|

Execute assigned missions, including thet specified in Annex 4.

(2) Provide three (3) 0-54 photogravhic! aircraft and crews for
i-Day.

(See Annex L, TG 7, 4"Operations Order 5-54).

(3)

Provide adequate SA-16 and other required SAR supzort to
the AOC and CIC for operational control throughout the
N-Day Ivent, (See Amex PF, TG 7.4 Opcrations Créer 5-54).

(4)

Provide adequate 'B-29 weather reconnaissance, cloud traci-ing
and sampling services throughout the "~Day Zvent. (See

Annex Hl, TG 7,4 Operations Order 5-54).

(5) Assure adequate pre-mission weather forecasting as recuired
for the ‘!-Day Event,

(6)

Provide necessary veather briefings and weather rercrts to
the CIC and AOC throughout the 1-Day Event.

(7)

Assure adequate communications facilities throughout the

(8)

Augnent the field maintenance facilities of the Test Swort
Unit as re-wired,

(9)

Coordinate with Test Aircraft Unit to assure thot Test Services
Unit aircraft are marshellec as required by that unit.

H-Day Event.

(10) Provide for complete ccre, storage and issue of personal
equipment to all air crews of the Test Services Unit.

TASK GROUP 7.4
OPRS ORDER 7-54

Select target paragraph3