. HEADQUARTERS

Te,oyCROUP 7,4, 2RCTISICNAL

.g?

tio

og.

187, c/o Po tnester

San Francisco, California

19 Avril 1954, 1800 1

OPERATIONS ORDER NO. 7.54
QUARTROFIRGNCES:
a,

World Aeronautical Charts (748, 749, $48, 849, 850) 1:1, 000,000,

b. USAF Aeronautical Planning Chart (AP-14) 1:5,000,000.

TSK ORGANTZATION:

1.

a,

Headquarters Task Group 7.4, Brigadier ‘General Hovell if, Estes, dr.

b.

Test Aircraft Unit

Lt Colonel Janes A, iaticins

ce.

Test Services Unit

ut Colonel Mahlon B. Harmond

d.

Test Sunport Unit

Colonel Janes F, Stcrkey

Provisional

GdNERAL SITUATION:

The nission covered by this Operations Order is assigned the code
nene NECTAR, Its execution day is N-Day, Aircraft positioning in snece
at Il-Hour and Flight Patterns are issued as Annex "D", This order is a
specific directive to all elermnts of the 4ir Toree Task Group to execute
their assigned missions in suport of iMCT/R, This order supplencnts

Tasi: Group"Ted, Operetions Order 1-53 and 5-54 which are in effect.
a,

See Annex A, Intelligence, TG 7.4 Onerations Order 1-53.

b. See Annex B, Organization and Command Relationships, TG 7.4
Oper-tions Order 1-53.
(1)

Task Group 7.3 will nrovide, to Task Group 7.4, airerat

control facilities ahoard the Corrund Shin and the Control
Destroyer for the N-Day Event, (See Annex A, Check List,
this Operations Order and Annex T, Command Ship CIC
Procedures; Annex U, Control Destroyer Procedures, Opsrations
Order 5-54.)

(2)

B+50 aircraft of the 97th Domb Wing ({ediun) will varticipete
on il-Day. (Sce Annex 0, B-50 IDDA Flight Procedures, TG 7.4

Oearatdons Orfier 5-54 and Annex A, Check List; this Oper-tions
Order).

2. LISSION:
To nerticipate in the NSCTAR

SET,
3.

Event as directed by Joint Task Force

TASNS FOR
SULORDIN.TS UNITS s
ae

Test Airereft Units:

(1)

xeeute assigned ixission to include that syecified in Annex 4,

(2)

Provide seven (7) F~84 adrercft for neccessary scmpling missions
for W-Doay.

TASE GROUP 7.4
OFPnS C°DR VO. 7-54

(See Annex H, Operations Order 5- 5h)6

Select target paragraph3