CHAPTER 18.1
ROLL-UP PLANNING
The authorization for roll-up, maintenance, and salvage operations

(Job No.5) is contained in Article III, Paragraph I, of Contract AT-

(29-1)-507.

These operations were scheduled to begin as soon after the

completion of experiments as safety considerations permitted.

The basic specifications covering these operations were prepared

under date of April 19, 1951 and sent to the Jobsite, As furnished
for use by field personnel, these specifications entitled "Guide Specifications for Procedures in Preparing Equipment and Materials for Storage", contained reproductions of applicable government standards. In
addition, field personnel were furnished with a booklet, "Roll-up Pro-

cedure, Eniwetok Proving Ground Facilities", which included a supple-

ment, "Materials on Hand at Jobsite for Use in Roll-up", and a supple-

ment, "Property Lists Including Disposition by Surveys and Storage
Location", This booklet; the "Guide Specifications for Procedures in
Preparing Equipment and Materials for Storage", without the reproductions of government standards; and the supplement, "Materials on Hand

at Jobsite for Use in Roll-up", are presented as exhibits at the end of
this Section.

18-1