JOB 5 WORK ORDERS (Continued)
AEC

W,0,No.

Description

Date

Issued

Site

User

1097

Dig eight foxholes for series 86 stations 5/18/51

E

SBN 2.0

1098

Relocate lead bricks and sandbags.

5/19/51

E

TU 3.1.1

1099

Request for equip. operators & mechanic.

5/19/51 B,E

1100

=Erect tents; cover 14la with canvas;

5/19/51

E+ All Users

1101

Cut 70 three feet long pipe stakes.

5/19/51

E

TU 3.1.5

1102

Install pipe frame-works on reef.

5/19/51

E

J-3

1103

Burn open three sample holders.

5/19/51

B

J-3

1104

Furnish caterpillar & operator to haul
out pipe.

5/19/51

Ew TU 3.1.1

1105

Furnish pump man; erect tent with frame,

5/19/51 E

TU 3.1.5

Furnish labor & equipment to remove
Station 121,

5/21/51

V

Prog. 1.7

1107

Mfgr. box to hold 32 microscope slides.

5/19/51

B

TU 3.1.5

1108

Repair duplicating machine.

5/

B

Ded, TG 3.1

1109

Modify nitrogen cylinder; install in
tower.

5/21/51

E+

TU 3.1.1

1110

Make a wire rope "come-along".

5/22/51

B

J-=3

1111

Gen. overhaul & replace motor in ditto

5/22/55.

B

TG 3.1

1112

Perform miscellaneous work on tower.

5/22/51

Ee TU 3.1.1

1113

Cover Building 212A with tarpaulin.

5/23/51

B

1114

Remove shielding on Sta, 132B for data
recovery.

5/24/51

E

1115

Remove 7 M-G sets from the back of Sta,

5/24/51 E,V

NRLK

1116

Burn open ten sample holders.

5/25/51

J-3

' 1106

17-64

place cots,

machine,

132b.

/51

B

D3

J-3
NRLK

~

Select target paragraph3