JOB 5 WORK ORDERS (Continued)
AEC
W.O,No,

Description

Date
Issued

Site

User

1077

Fabricate & deliver eight 2" pipe sectiong5/16/51

B

J-3

1078

Drill holes in reef; survey work.

5/16/51

E

J-3

1079

Cover J-3 wire rope with sand & sandbags. 5/16/51

E

J-3

1080

Furnish wire rope to Station 18.

5/16/51 D,E

J-3

1081

Install doors on Building 12,

5/16/51 L

SEN 2,0

1082

Load two 1000 lb. spectrographs on truck. 5/16/51

N

NRLH

1083

Place four floodlights on tower.

5/16/51

E

CMR

1084

Wind wire rope onto a spool,

5/17/51

E

J-3

1085

Supply Station 57 with electric service,

5/17/51

E

J-7

1086

Furnish labor to assist in recovering

5/17/51

E

1087

Perform miscellaneous work in tower.

5/17/51

E* TU 3.1.1

1088

Mfgr. one plywood box with hinged top.

5/17/51

B

1089

Move camera flare shield from Sta.#335a
to #69.

5/17/51

E

TU 3.1.1

1090

Survey concrete footing, cable anchors

5/18/51

E

TU 3.1.1

1091

Cancels AEC WO, 1086; Requisition for

5/17/51

E

1092

Supply 4 5 ft. lengths of 3/4" galv.

5/18/51

B

3.1.1.7

1093

Mfgr. 17 boxes for couriering classified

5/18/51

B

JTF-3

1094

Place cameras on collimators;erect tents, 5/18/51

E

J-3

1095

Grade road; build gate; cover connection

5/18/51

E+ Prog. 1

1096

Weld ten sample holders.

5/19/51

B

*

Supplement

equipment,

for tower,

labor, ~~

steel pipe.

files.

hole,

NRLK

NRLH

NRLK

J~3

17-63

Select target paragraph3