JOB 5 WORK ORDERS (Continued)
AEC

W,0, No,

Description

Date

Issued Site

177

Install convenience outlet strip in

2/17/51

178

Requisition for plywood,

2/17/51 B CTU 3.1.3

179

Install anchor for a one inch nylon
rope.

2/17/51 C

180

Request for miscellaneous work.

2/19/51 B

181

Install power & lighting; relocate
MP shack,

2/19/51 B

182

Bolt four 2 x 4's across ceiling of
working space,

183

Install add. coaxial line; dig trenches,

2/17/51 E,V NRLK

184

Increase rating of utility circuits in

2/19/51 B

LASL

185

Paint and install office designator

2/19/51 B

TG 3.1

186

Install add. electrical power outlet.

2/19/51

B

JTF-3

187

Secure misc, materials & supplies

2/19/51

B

NRLK

188

Manufacture & install bulletin boards.

2/19/51 B

189

Supply 200 linear feet of 1" pipe.

2/17/51 E,V 1.7.1.2

190

Repairheavy shipping crate,

2/19/51

B

191

Request 10 shts.1/2" plywood 28" x 28",

2/20/51

B

AFORL

192

Reinforce two anchors nearest zero.

2/20/51

E

AFORL

193

Locate reinforcing anchors for forward

2/20/51

C

AFORL

194

Manufacture cabinet.

2/19/51 B

JTF-3

195

Install partitions in Building 221.

2/8/51

196

Supply lumber for tent frames, acetylene, 2/19/51

Bldg. 232,

Eldg. 212A.
shingles.

from Honolulu.

cables,

oxygen.

B

User

NRLK

J-7
NRLH
D-2

2/19/51 E,V NRLK

B
E

JTF-3
WNRLK

JTF-3
Proj. 8.2
17-17