JOB 5 WORK ORDERS (Continued)
AEC

W.0. No.

Description

Date

Issued Site

159

Mfgr. & install cabinets, locking bars,

2/15/51

160

Install airstrip lighting & wind socks.

2/16/51 B,E

All Users

161

Install plywood in Rms. A-5, A-9, A-ll,

2/16/51

B

D-3

162

Deliver 4 14' x 14! wall tents to

2/23/51

E

Proj. 8.2

163

Mount 2 stud bolts on outside wall of

164

Provide wood table in entrance of

hasps.

Bldg. 209.

E Warehouse.

Bldg. 69

Bldg. 69

B

User

JTF-3

| 2/17/51 C,D, TU 3.1.5
E

2/17/51 C,D

RAD-SAF

RAD~SAF

E

165

Construct one heavy duty table.

2/16/51

B

NRLH

166

Construct 5 pes.rough wooden shelving.

2/16/51

E

NRLK

167

Furnish & install tent outside of

2/16/51

B

168

Construct 2 lab benches; install outlets, 2/17/51

E

Prog. 6.3

169

Install temporary outlet in Bldg. 119c.

2/17/51

A

NRLH

170

Miscellaneous surveying.

2/17/51

B

NRLH

171

Overhaul electric motors to vacuum

2/17/51

C

NBS

172

Construct and install blackboards and
runner,

2/10/51

B

TG 3.1

173

Install telephones in Tent #66 & Sta.
134.

2/17/51

E

UCRL

174

Deliver lumber to Station 53,

2/17/51

C

NBS

175

Construct two shelves & blackboard

2/17/51

B

NBS

176

Locate & dig cable ditches; assist in

2/17/51 E,D, NOBL
V

17-16

Bldg. 211.

pumps. -

in Bldg. 211.

laying.