ce.

Shipping costs

d.

Stevedoring costs at Jobsite

e.

Lightering costs at Jobsite from ship to warehouse

f.

Intra-Atoll water movement of materials from warehouse
to construction site

Increased labor costs including:

a.

Higher recruiting cost due to requirement for security
and medical clearance

b.

Security and medical clearance costs

c.

Overseas pay bonus

d.

Cost of standby time awaiting shipment, and of travel

time between West Coast and Jobsite, including travel

expense and per diem allowances
e.

Cost of commiting time, i.e., time used by personnel
in intra-Atoll travel

f.

Cost of loss in time and efficiency due to climatic
conditions.

g.

Higher cost of insurance premiums for offshore construction

Increased equipment costs including:
a.

b.

Costs attributable to extraordinary maintenance due
to climatic conditions

Costs attributable to short lifetime of equipment

under conditions prevalent at Eniwetok Atoll

Increased camp operation and maintenance costs including:
a.

b.

Cost of operating separate camps at major site locations
within the Atoll

Cost of maintenance and repair of navigational aids,

piers, channels, airstrips, and equipment required for
the intra-Atoll movement of personnel and materials for

work at a miltiplicity of sites
ec.

Cost of recreational and medical facilities for construction personnel

Select target paragraph3