(e)

Prame ati rage vault

11727 38

Refriveration plant
Water facilities

127,74! .55
530, 43° 42

10,095.15
115,306.54

93,304.74
248 , 26h 41

24 40
6,150.96

12,301.54
119,393.58

406,775.91
837,193.43
67,745.59

76 ,CA2 2h
LET ,080.79
12,140.56

206,484.83
430,770.50
36,995.47

5,802.48
13,976.76
-

80,645.15
174,836.95
12,851.24

(f)

Tents, including slab

(1)
(§)

Sewer facilities
Fuel facilities

(g)
(h)

Qh, GRE 75

Electrical facilities
Telephone submarine cable
Telephone facilities
Centro) & sipnal system (included in

(a)

Radio bacx-up system (Equipment furnished
by Military)

Bogullus estimate)

(p}

Public Address system

(r)
(6)

Equipment for all buildings
Piers

fu}

Initial rehebilitation

(v)
tw)

{x}

Miscellsnecus Structures & Facilities

ENIWETOK ISLAND - BUILDINGS & FACILITIES
Blading & shaping
(Roads)

(a)

b)

Asphalt surfacing

<)

Dust palliative

id)

(Site Prep. )

$

Mudification of runway (Runway Shift & Surfacing}
{c)

CC 287.23
112,125.04

(4)
Plane parking areas
(f) (1) Air Porce Living Camp, Aluminum Bldgs.
(2) Tents, including slab

arnt

(2) Tents, including s}ab

{1} (1)
(2)
(3)
(x)

Aluminum Bligs., Army Service Center

144,74 Lb

9,381.45
15,307.98

3, 338.C
474.53

40,665.65
3,068.35

4 B27 .25
Loe. 51

1,°95

Te 329
199,255

-

16,5

-

-

10.50

3,967.83

135,591.48
10,109.07

$2, 728,159.38

ghee,788.56

$3,537,161.19

$ 451,935.49

§87,907.57

¢ E254,

$

§

$

$

?

1,994 .°7

-

32,320. 3°

17,193.50
51, 578,05

9, 308 6
TEL, 224.53
79,599.94

59.30

39, 450,06

154.07

Bo. 3f

18,568.54

-

-

4555.26
GbE 71

6,029.28
2h2 99
106.54

643.54

bo, 7b Ng

60,717.75

-

-

-

49,938.11
50,415.92

188 62

-

-

-

643
9,398.81

17, 382.27

197.30

17,571.20
22,499,56

22,774 45
Thyi72 88
Tew LTS

(eg) (1) Army Living Camp, Aluminum Bldgs.

(nh)

12,095

$

119.95

13,465
* 4,570

101,275

-

-

hil ,413.49
28,308.79

23,797 -&3

4,700.72

oe 4, ee
Life, 408
72,975

4 999. 36
4,335.28

97. .c0

«gih97,0€8.03

3,399 %

12,782.00
2,081.13

9,731.70
15,727.25

2,119.95

$E,4ho 120.02
1,28. 6

23,203.21
50,438.41
3,668.99

3,813.76

139,417.22
5, 80° 57

SE ORS LAS

36, 625
552,475

1,927.67

134,707.82
13,164.13

(Asphalt Roads)

106,050

8,977.49
5,494.15

6,256.7h

459,765.65
20 AQT. 3k

___—58,278 28

TOTAL

1,715

125.96

3,047.53
34,808 .78

15,292.18

-

dik 201 45

-

Beeoe

-

€1,509.59

-

:

-

15? , 365.77

(b)

C.M.R. Area Facilities
Underground Shelter Area

32,191.38
5é 453.39

4

21.48

-

6,385.56
12,037.35

-

Rehabilitation of existing warehouses

9,210.56

3s

-

1F 589, >

31,OT.71
50,708.76

30,483.19

5,852.18
3,047 14

-—

130.45

-

LhE, O12, 7h

498,154 be
154,611.76

438.65

1,839.16

23,412.87
54 46104

GO, 28

114 102

22,766.85

32,236.95
52,907.64

-

Furniture for all buildings

(t}

"590.78

30,510.53

109,436 Ui
182,121.74

fr)
(1)
(nj
{n)

(a)

“"y3Bli1o

23,318.03

20.51

23.59

1,293.95

156.11

117.55

5,857.34

2,918.04
801.09

17,221 44
23, 352,

-

6,146.49
4, 346.79
1,907.25

BT, 322.05

-

2,957.43

102,172.23

-

2,756.34

-

1,064,957

—_—T,18K.09

32.42

36.21

1,419.05

5,304 52
6,792.20
1,820.12
73.36
32.17

TPT. 30

TH .S1

TTR.

B3°. 3
3,172.20
5,382.71
729.99

335,240 ##
27,295

Ao,sad

73

9,039

7,115

39,309

Lhe thd
174,265 (a)
PL PS
197,175
AR ho

194.27

2,955.08

Oboe

46.51

4 8h 33

Lah roe

17.90

403,16

54,8

Aluminum Bidgs., Common Services
Tents, including slab
Aluminum Bldgs., Air Force Operational
Aluminum Bléege., Transmitter & Receiver
Bldgs. & Power Houses
(L) (1) POL Facilities - On Shure

og? , wT As
54,704.63
192 ,°54, 79

AZ, 511. 59
“Wu. 32
1,881.12

599,004 .°8
51 039,66
148,660.96

38.09
~
-

174,547.18
1,796.18
6,105.21

4g, 089.25
135.34
595.79

11,917.00
25.13
5,591 .92

EES
71,805
Pet bo:

79,712,68
95 ad be

15,403, 96
159.53

42,199.65
88,651.83

713.86
-

1,170.48
2,415.95

4 650.13
48.16

753.55
4,133.95

BC, bas
129,445

(m) (1)
(2)
(x)
(co) (1)
(2)
(p)
(a)
(r)
(s)

238,315.07
221 P8750
164 287 4
57,839 48
15, LTE 73
pa are sg
200,71 .65
20,979, 27
45,435.27

28,981.78
59,127.75
1,820.1)
BOA
3,994.33
12,353.56
6,356.42
30.49
13,715.49

168,216.82
82,446.20
154,919.07
53,432.71
€ 205.61
55,80" 38
182,524.60
20,168.28
10,416,56

273.58
1,394.88
3,228.74

32,693.75
56,121.56
5,724.43
1,441.21
4,072.98
12,550.27
1¢, 887.73
544.17
13, 7CT-

8,749.04
16,641.99
54643
24.39
1,205.83
3,430.53
1,927.93
9.20
4 iko.bk

10,155.12
1,87 37
2, BAC. 22
5,108.52
226.25
225.25

312,915
of, Aae
499, 579
gu 1hs
32,195
194, 225
E45 440
4S ,7hI
105,565

$3,108,077

524,976.71

$2,214,295.36

$10,470.38

384,819.45

$101,123.82

$ 60,390.29

G15 239

(2) POL submarine lines

1G ,779 2?

Electrical Generation Facilities
Blectrical Distribution Facilities
Telephone Facilities
Sever Facilities
Sewer Outfall {only )
Water Facilities
Water Distillation Piant (only)
Cargo Pier
Personnel Pier
TOTAL

3,298.90

11,957.98

-

3,528.54

$

Miscellanecus Services for the Construction
Battalion

imcurred

include odditicne#l

Also edditicnal

Electrical

36,920

* 145,900 ‘Tentat

Fucilities

isabor e-sts chargeable to U.C.RV.L,

-

$ 3,760,220

# This estimate has out been formally cubmitted to A.E.C. for nescriation.
** Coats

992 95

for C.M.h.,

on an

Part

inter- ffice

of which are covered

trensfer.

in the estimate cf atk}.

Select target paragraph3